| 1. | A new method for ground subsidence control in coal mining 煤矿开采沉陷有效控制的新途径 |
| 2. | Evaluation on stability of ground subsidence in a mining area 矿区开采沉陷的稳定性评价 |
| 3. | Field survey study on ground subsidence laws of strip mining 条带开采地表沉陷规律实测研究 |
| 4. | Analysis of ground subsidence caused by metro tunnel excavation 地铁隧道开挖引起地表塌陷分析 |
| 5. | Reasons of ground subsidence and crack in a factory building 某厂房地面沉降及其开裂的原因分析 |
| 6. | Analysis on ground subsidence for tunnel pipe - jacking pre - support 隧道顶管预支护的地表沉降分析 |
| 7. | Research of a new method for ground subsidence control in coal mining 煤矿开采沉陷有效控制新途径的探讨 |
| 8. | Study on calculating method of ground subsidence caused by pit - dewatering 基坑降水引起地面沉降计算方法研究 |
| 9. | Study of ground subsidence prediction model for full section and deep mining 大采深全断面地表沉陷预测模型研究 |
| 10. | The effect of coal pillar ' s sizes on the ground subsidence in short - wall mining 短壁开采中煤柱尺寸对地表沉陷的影响 |